Price | Customized |
MOQ | 1 |
Delivery Time | 1 Month |
Brand | Sinuo |
Place of Origin | China |
Certification | Calibration Certificate (Cost Additional) |
Model Number | SN336 |
Packaging Details | Plywood |
Payment Terms | L/C, T/T, Western Union, MoneyGram |
Supply Ability | 5 Sets Per Month |
Place of Origin | China | Packaging Details | Plywood |
Test Specimen | Horizontal and Vertical Storage Water Heaters | Model Number | SN336 |
Supply Ability | 5 Sets Per Month | Certification | Calibration Certificate (Cost Additional) |
Brand Name | Sinuo | Payment Terms | L/C, T/T, Western Union, MoneyGram |
Workstation | 2 | Price | Customized |
Delivery Time | 1 Month | TotaPower | 3.5KW×2 |
Test Standard | IEC 60335-2-21:2012 clause 22.102, 24.102.1, 24.102.2 | Minimum Order Quantity | 1 |
IEC 60335-2-21 Horizontal and Vertical Storage Water Heaters Performance Testing Machine
System
Introduction:
This
water
heater
performance
testing
system
conforms
to
IEC
60335-2-21:2012
clause
22.102,
24.102.1,
24.102.2.
It
is
used
to
test
the
performance
of
horizontal
and
vertical
storage
type
electric
water
heaters
when
passing
water
and
electricity,
such
as
the
sealing
&
heating
performance
of
water
heaters
when
passing
water.
Parameters
can
be
displayed,
automatically
recorded,
and
queried
during
testing.
Test
sequence:
Supply
water
and
electricity
Water
flow
test
Water
temperature
test
at
the
exit,
Case
temperature
and
average
temperature
test,
Five
safety
performances
testing
such
as
voltage
withstand,
leakage
current,
insulation
resistance,
grounding
resistance
and
power.
Functional
Requirements
and
Configuration:
1.
Inlet
pipe:
tap
water,
the
inlet
water
temperature
does
not
need
to
be
controlled.
2.
There
are
two
stations
for
horizontal
and
vertical
water
heater
tests.
The
length
of
horizontal
station
is
110cm,
and
the
height
of
vertical
station
is
80cm.
Each
station
can
withstand
a
weight
of
150kg,
with
good
rigidity,
no
deformation.
The
wall
mount
position
is
adjustable
in
the
vertical
direction,
and
the
hook
is
adjustable
in
the
left
and
right
direction.
3.
Each
station
is
equipped
with
a
0.5
level
digital
display
electrical
parameter
meter
(current,
voltage,
power).
4.
One
pressure
gauge
(accuracy
0.5,
minimum
scale
0.02Mpa,
range
1.0
Mpa)
,
one
electromagnetic
flowmeter
(minimum
scale
0.5L/min,
range
20L/min)
and
one
angle
seat
valve
are
installed
on
the
inlet
pipeline
of
each
station.
Each
station
is
equipped
with
an
interface
for
compressed
air.
5.
Each
station
is
equipped
with
one
European
standard
socket
and
one
American
standard,
and
one
set
of
high-power
terminals.
6.
The
whole
equipment
is
grounded,
each
station
has
independent
leakage
protection
device,
the
electrical
control
part
has
waterproof
function,
and
the
electrical
line
can
meet
the
total
current
requirement.
7.
The
sink
and
the
pipeline
are
made
of
304
stainless
steel
material,
the
frame
is
the
formed
aluminum
structure,
and
the
sealing
plate
is
sprayed
with
A3
plate,
which
is
beautiful
&
atmospheric.
8.
The
maximum
time
for
power-on
"_hour_minute_second"
can
be
set
(normally
full
filled
with
water
or
the
maximum
heating
time
after
thermostat
is
reset
during
the
cycle
test.
If
the
water
heater
continues
to
heat
up
after
the
time
is
up,
the
water
heater
is
faulty,
the
system
will
prompt
an
alarm).
The
maximum
time
for
power-off
"_
hour
_
minute
_
second"
can
be
set
(the
water
heater
should
reheat
after
period
from
after
the
thermostat
is
disconnected
to
the
set
maximum
delay
time,
if
the
water
heater
still
does
not
heat
after
the
time
is
up,
then
the
water
heater
heating
element
or
thermostat
are
faulty.
The
device
will
prompt
an
alarm).
9.
The
total
testing
time
"_hour_minute_second"
can
be
displayed,
and
the
numbers
of
testing
can
be
displayed.
10.
The
upper
and
lower
limits
of
the
power
&
current
of
the
water
heater
can
be
set
(the
power
&
current
can
be
judged
when
the
power
is
turned
on
and
off,
and
the
device
will
alarm
if
it
is
out
of
the
range).
11.
Power
requirement:
Total
power:
3.5KW×2(voltage
regulator
/
voltage
stabilizer
/
variable
frequency
power
supply
are
customer-supplied)
Test
bench:
220V
50HZ
12.
Equipment
size:
About
2400mm×750mm×2000mm
Test
process:
1.
According
to
the
standard,
the
storage
water
heater
is
placed
with
10
temperature
points
on
the
outer
layer
of
the
inner
liner,
the
temperature
of
each
point
during
the
heating
process
of
the
water
heater
is
recorded.
2.
First,
start
the
inlet
angle
seat
valve,
then,close
the
inlet
angle
seat
valve
after
filling
the
water;
3.
Start
the
heating
test
(Determine
whether
it
is
heated
and
the
current
power
&
current
are
within
the
set
range.
If
the
it
doesn’t
heat
or
power
&
current
are
not
within
the
range,
or
the
electric
water
heater
is
still
heated
when
it
reaches
the
set
maximum
time,
the
device
will
stop
and
alarm,
and
the
touch
screen
will
display
the
alarm
content.
It
can
be
reset
by
pressing
the
"Alarm
Reset"
button);
4.
When
the
thermostat
is
disconnected
for
the
first
time,
the
inlet
angle
seat
valve
is
filled
with
water,
and
the
water
is
tapped
at
a
rate
of
approximately
2
l/min
or
10%
of
the
capacity
of
the
apparatus
per
minute,
according
to
the
lowest
value,
until
the
thermostat
restores
the
current.
When
the
thermostat
functions
again,
of
water
is
again
tapped
at
the
same
rate
until
the
thermostat
turns
on
the
power,
this
sequence
being
repeated
until
establishment
of
the
conditions
of
mode.
The
temperature
of
the
water
measured
at
the
exit,
should
not
exceed
98
°C
(system
will
judge).
5.
After
the
thermostat
functions
for
the
first
time.
A
quantity
of
water
equal
to
25%
of
the
capacity
of
the
tank
then
is
tapped
and
replaced
by
cold
water.
Immediately
after
the
thermostat
functioned
for
the
second
time,
it
is
shorted-circuit.
The
test
is
continued
until
the
thermal
circuit
breaker
functions.
The
outlet
valve
is
then
opened
and
the
temperature
of
the
water
measured
at
the
exit.
The
temperature
measured
should
not
exceed
99
°C
(system
will
judge).
6.
The
water
heater
is
put
under
operation
under
the
normal
operating
conditions
and
1,15
times
the
assigned
power,
with
the
valve
outlet
closed
and
shorted-circuit
thermostats,
until
the
thermal
circuit
breaker
functions.
The
thermal
circuit
breaker
must
function
before
its
temperature
is
measured,
system
will
judge
whether
it
exceeds
110
°C.
The
outlet
valve
is
then
opened
and
the
temperature
of
the
water
measured
at
the
exit.
The
measured
temperature
should
not
exceed
to
20
°C
the
maximum
assigned
safety
temperature
of
the
thermal
circuit
breaker
(system
will
judge).
Main
Accessory:
S/N | Component name | Specifications and models | Remarks |
1 | Sheet metal and frame | A3 spray + molded aluminum | |
2 | Sink | 304 stainless steel | |
3 | Temperature acquisition module and thermocouple wire | 20 channels US Agilent + 25 meters Omega | |
4 | Electrical parameter meter | Sanyou | |
5 | Wuhe safety gauge | Aipu / single phase 6KW | |
5 | Pressure gauge (0-1MPa) | Hongqi | |
6 | Electromagnetic Flowmeter | Made in China | |
7 | Pressure Transmitters | SOKYO | |
8 | Angle seat valve | Made in China | |
9 | PLC | XINJE | |
10 | Expansion module | XINJE | |
11 | Touch screen | WEINVIEW | |
12 | Pressure regulating valve | Norgren | |
13 | Electrical material | Chint | |
14 | Other water pipes, ball valves, tees, joints, etc. | 304 stainless steel |
Referrence
testing
system
at
client's
site: